
Notes from the quarry floor
What we would tell a project manager or a site engineer on the phone, written down once. Gradings, tests, plant, rock, haulage and the paperwork around them.
- Articles
- 50
- Topics
- 8
Own a crusher plant or contract the crushing? How highway contractors decide
8 min read
What sits inside a per-tonne crushing rate, and what sits outside it
7 min read
How to choose a crushing contractor: twelve questions worth asking
7 min read
Setting up a stone crusher plant on a highway site: the first 30 days
7 min read
Mobile or stationary crusher plant: which suits a highway package
7 min read
Consents and clearances a stone crusher plant needs in India
7 min read
GSB material: gradings I to VI, tests and laying under MoRTH Clause 401
7 min read
Wet Mix Macadam (WMM): grading, mixing and laying under MoRTH Clause 406
7 min read
GSB vs WMM: the difference, and why a road needs both
7 min read
Flakiness and elongation index: the limits, the test and what the crusher has to do with it
7 min read
Aggregate tests for highway work: impact value, abrasion, crushing value and water absorption
7 min read
Sieve analysis: how to read a grading table and a failing result
7 min read
Jaw, cone and VSI: what each stage of a three-stage crushing plant does
7 min read
Jaw plates, cone liners and screen mesh: what wears on a crusher and what it costs in downtime
7 min read
Crusher dust, M-sand and river sand: what is the difference?
7 min read
GSB, WMM and aggregate supply around Prayagraj: where the stone comes from and what decides the rate
7 min read
10mm, 20mm and 40mm aggregate: which size goes where
7 min read
How much GSB and WMM does a kilometre of road need?
7 min read
Tonnes, cubic metres, brass and cubic feet: converting aggregate quantities
7 min read
Layers of a highway pavement, from sub-grade to wearing course
7 min read
Lead distance: why the same aggregate costs more 40 km down the road
7 min read
Aggregate rate contracts: what to fix and what to leave floating
7 min read
Weighbridge slips and month-end reconciliation: getting billed for what arrived
7 min read
Royalty and transit passes: the paperwork that rides with a load of aggregate
7 min read
Opening a stone quarry face: from bare ground to the first tonne
7 min read
Bench height, width and face angle in a stone quarry: what the regulations say
7 min read
Quarry lease, mining plan and environmental clearance: how stone is permitted in India
7 min read
Basalt, granite, sandstone, limestone: how the rock changes the crushing
7 min read
Overburden and stripping ratio: the tonnes you move before the tonnes you sell
7 min read
Monsoon on a quarry and crusher site: what stops, what slows and how to plan for it
7 min read
What is controlled blasting? Pre-splitting, smooth blasting, muffling and delays
7 min read
Ground vibration limits for blasting in India: the DGMS table and how to stay inside it
7 min read
Blasting near houses, roads and structures: what changes in the design
7 min read
Explosives licences and shotfirers: who is allowed to blast in an Indian quarry
7 min read
Flyrock: what causes it and how a blast is designed to prevent it
7 min read
Fragmentation: why the blast decides what the crusher produces
7 min read
Embankment and sub-grade compaction: what 95% and 97% of MDD mean on site
7 min read
Field density test by sand replacement: the procedure and what a failing result tells you
7 min read
CBR explained: the test, the number and what it does to pavement thickness
7 min read
Cut and fill: balancing earthwork and reading a mass haul diagram
7 min read
Building a quarry haul road: width, gradient, drainage and why it pays
7 min read
Clearing and grubbing: what MoRTH Clause 201 covers and how it is measured
7 min read
How much does a tipper carry? Legal payloads, body sizes and the overloading rules
7 min read
How many tippers does a plant need? Working it out from cycle time
7 min read
Moving a crusher plant between states: low-beds, ODC permits and re-erection
7 min read
Own tippers or market hauliers: who should carry your aggregate
7 min read
Get a rate
Tell us what your site needs
Four things and we can quote it. Send it before 6pm on a working day and you will hear back the same day.
Where · What · How much a month · When
